24-01 2024 URBAN PAVING PROJECT
|
|
Dec 4, 2023
|
Open Until Contracted
|
23-1858 RFP SALE AND DEVELOPMENT OF CITY-OWNED PROPERTY MASON-MORROW-MILLGROVE ROAD
|
|
Nov 20, 2023
|
Open Until Contracted
|
23-18 REBID FINISH MOWING
|
|
Nov 6, 2023
|
Open Until Contracted
|
23-19 REBID CITY PARK SHARED USE PATH
|
|
Nov 6, 2023
|
Open Until Contracted
|
23-15 FUEL PURCHASING 2024 THRU 2028
|
|
Oct 23, 2023
|
Open Until Contracted
|
23-14 BUSH HOGGING AND FINISH MOWING 2 YEARS WITH OPTIONAL 3RD YEAR
|
|
Oct 9, 2023
|
Open Until Contracted
|
23-17 LANDSCAPING-PLEASANT SQUARE CONNECTOR PARK
|
|
Sep 18, 2023
|
Open Until Contracted
|
23-16 PLEASANT SQUARE CONNECTOR PARK
|
|
Sep 10, 2023
|
Nov 3, 2023
|
23-06 COMPOSITE WATER TOWER PAINTING
|
|
Sep 4, 2023
8:00 AM
|
Nov 1, 2023
|
23-13 FURNISHING WATER METERS 2024 THRU 2026
|
|
Sep 4, 2023
8:00 AM
|
Open Until Contracted
|
23-12 CITY PARK SHARED USE PATH
|
|
Jul 31, 2023
|
Open Until Contracted
|
23-10 WASTEWATER TREATMENT PLANT AERATION SYSTEM IMPROVEMENTS
|
|
Jul 24, 2023
|
Sep 8, 2023
|
23-07 RFP PURCHASE and REDEVELOPMENT 102 and 112 PLEASANT ST
|
|
Jun 19, 2023
|
Jul 20, 2023
|
23-08 CHERRY ST RECONSTRUCTION
|
|
Jun 18, 2023
|
Jul 27, 2023
|
23-05 PLEASANT ST WATER MAIN EXTENSION
|
|
Apr 30, 2023
|
Jun 30, 2023
|
23-1857 RFP UPDATE ARCHITECTURAL REVIEW OVERLAY DISTRICT AND HISTORIC PRESERVATION GUIDELINES PROFESSIONAL SERVICES
|
|
Apr 17, 2023
8:00 AM
|
Jun 14, 2023
|
23-1856 RFP PARKS FACILITY PRELIMINARY ARCHITECTURAL DESIGN
|
|
Apr 10, 2023
8:00 AM
|
May 12, 2023
|
23-04 NEW 69KV GLOSSER SUBSTATION AND 69KV MONROE SUBSTATION UPGRADE-MAJOR EQUIPMENT
|
|
Apr 3, 2023
|
Open Until Contracted
|
23-1855 RFQ ACQUISITION AND ADAPTIVE REUSE/REDEVELOPMENT OF 120 SOUTH BROADWAY
|
|
Mar 19, 2023
|
Jun 14, 2023
|
23-1854 RFP CITY OF LEBANON SPORTS COMPLEX FIELD USAGE ASSIGNMENT
|
|
Mar 6, 2023
|
Apr 25, 2023
|
23-02 2023 CONCRETE PROGRAM
|
|
Mar 5, 2023
|
Apr 28, 2023
|
23-03 2023 PAVING PROGRAM
|
|
Mar 5, 2023
|
Apr 28, 2023
|
23-1852 RFP/RFQ PURCHASE OF AN ELECTRIC & WATER ADVANCED METERING INFRASTRUCTURE SYSTEM (AMI)
|
|
Feb 6, 2023
|
Open Until Contracted
|
23-01 URBAN PAVING
|
|
Dec 28, 2022
|
Mar 21, 2022
|
22-1853 RFQ SOLAR ARRAY GENERATION PROJECT
|
|
Dec 5, 2022
|
Apr 17, 2023
|
22-16 REEDERS RUN SANITARY SEWER IMPROVEMENTS
|
|
Oct 25, 2022
|
Jan 19, 2023
|
22-14 N BROADWAY STREETSCAPE PHASE 3
|
|
Sep 26, 2022
|
Nov 10, 2022
|
22-13 RAILROAD BRIDGE 4.10
|
|
Sep 19, 2022
|
Nov 30, 2022
|
22-03 MECHANIC STREET RECONSTRUCTION
|
|
Jul 5, 2022
|
Sep 8, 2022
10:00 PM
|
22-12 PARKS DIVISION 4100 MOWER REPLACEMENT
|
|
Jun 20, 2022
10:00 AM
|
Jul 8, 2022
|
22-1851 RFP POLICE PUBLIC SAFETY FACILITY STUDY CONSULTANT SERVICES
|
|
Jun 13, 2022
8:00 AM
|
Aug 25, 2022
|
22-05 MULBERRY ST WATER MAIN REPLACEMENT
|
|
Jun 6, 2022
10:00 AM
|
Aug 2, 2022
|
22-11 N BROADWAY STREETSCAPE PHASE 2
|
|
May 22, 2022
10:00 AM
|
Jul 6, 2022
|
22-10 GRANT DRIVE CUL-DE-SAC
|
|
Apr 17, 2022
10:00 AM
|
Jun 8, 2022
10:00 AM
|
22-09 RESTROOM FACILITIES
|
|
Mar 27, 2022
10:00 AM
|
May 13, 2022
10:00 AM
|
RFP/RFQ 22-1850 GLOSSER ROAD SUBSTATION ENGINEERING
|
|
Mar 27, 2022
10:00 AM
|
Aug 3, 2022
|
22-1849 PARKING EQUIPMENT AND MANAGEMENT SYSTEM
|
|
Mar 7, 2022
8:00 AM
|
Dec 5, 2022
|
22-08 GLOSSER RD PUMP STATION AND EQ IMPROVEMENTS
|
|
Feb 7, 2022
7:00 AM
|
Apr 12, 2022
10:00 AM
|
22-02 2022 PAVING PROGRAM
|
|
Feb 7, 2022
7:00 AM
|
Mar 22, 2022
10:00 AM
|
22-01 2022 CONCRETE PROGRAM
|
|
Feb 7, 2022
7:00 AM
|
Mar 29, 2022
10:00 AM
|
22-07 MUNICIPAL CLEANING SERVICES
|
|
Jan 24, 2022
10:00 AM
|
May 5, 2022
|
22-04 DOWNTOWN RESTROOMS FACILITY
|
|
Jan 3, 2022
7:00 AM
|
Mar 23, 2022
10:00 AM
|
21-1848 SPORTS COMPLEX FIELD USAGE ASSIGNMENT
|
|
Nov 14, 2021
10:00 AM
|
Dec 15, 2021
10:00 AM
|
21-09 REEDERS RUN SANITARY SEWER IMPROVEMENTS
|
|
Oct 10, 2021
10:00 AM
|
Dec 9, 2021
3:00 PM
|
21-1846 RFQ-2022-2024 CIVIL ENGINEERING DESIGN SERVICES
|
|
Sep 12, 2021
10:00 AM
|
Dec 31, 2021
10:00 AM
|
21-1847 RFP HEALTH INSURANCE BROKERAGE AND CONSULTANT SERVICES
|
|
Sep 12, 2021
10:00 AM
|
Jan 6, 2022
10:00 AM
|
21-16 FARM LEASE PROGRAM
|
|
Sep 12, 2021
10:00 AM
|
Jan 21, 2022
8:00 AM
|
21-14 ELECTRIC DEPT BLANKET MATERIAL BID
|
|
Jun 21, 2021
8:00 AM
|
Feb 7, 2022
7:00 AM
|
21-15 ELECTRIC DEPT LINE CLEARANCE
|
|
Jun 21, 2021
8:00 AM
|
Sep 20, 2021
|
21-13 CAB & CHASSIS OUTFITTING-WATER/SEWER DIVISION
|
|
Jun 21, 2021
8:00 AM
|
Aug 10, 2021
|
21-1845 RFQ REUSE/REDEVELOPMENT OF PROPERTY 535 NORTH BROADWAY
|
|
Jun 21, 2021
8:00 AM
|
May 2, 2023
|
21-06 NEW ST RECONSTRUCTION
|
|
Jun 14, 2021
|
Jul 27, 2021
9:00 AM
|
21-1843 RFQ PREMIER HEALTH BIKE PARK NORTHERN MOUNTAIN BIKE TRAILS DESIGN-BUILD PROJECT
|
|
Apr 11, 2021
10:00 AM
|
Oct 5, 2021
|
21-1844 RFQ PROPERTY AND CASUALTY INSURANCE BROKERAGE AND CONSULTANT SERVICES
|
|
Apr 11, 2021
10:00 AM
|
Jun 29, 2021
|
21-04 WRIGHT AVE RECONSTRUCTION
|
|
Mar 7, 2021
|
May 4, 2021
|
21-05 N SYCAMORE STREET RECONSTRUCTION
|
|
Feb 14, 2021
|
Mar 25, 2021
|
21-01 2021 CONCRETE PROGRAM CONTRACT 1
|
|
Feb 7, 2021
|
Mar 24, 2021
|
21-02 2021 CONCRETE PROGRAM CONTRACT 2
|
|
Feb 7, 2021
|
Mar 24, 2021
|
21-03 2021 PAVING PROGRAM
|
|
Feb 7, 2021
|
Mar 25, 2021
|
21-11 LEBANON TRAIL
|
|
Jan 10, 2021
|
Open Until Contracted
|
20-04 RAIL LINE TIE REPLACEMENT AND CROSSING UPGRADE PROGRAM
|
RAIL LINE TIE REPLACEMENT AND CROSSING UPGRADE PROGRAM
|
Dec 12, 2020
10:00 AM
|
Apr 28, 2020
1:00 AM
|
20-1842 DESIGN SERVICES-GLOSSER ROAD PUMP STATION/EQ BASIN IMPROVEMENTS
|
|
Nov 8, 2020
|
Feb 24, 2021
|
20-13 MOWING
|
|
Oct 11, 2020
|
Apr 29, 2021
|
20-12 N BROADWAY STORM SEWER REPLACEMENT
|
|
Aug 30, 2020
|
Open Until Contracted
|
20-10 REFUSE/RECYCLING COLLECTION SERVICES
|
|
Aug 23, 2020
|
Open Until Contracted
|
20-02 SUMMIT ST AND HIGHLAND AVE RECONSTRUCTION
|
|
Jul 19, 2020
|
Open Until Contracted
|
20-11 Fire Station 41
|
|
Jun 14, 2020
|
Jul 30, 2020
|
20-1841 RFQ REUSE/REDEVELOPMENT FIRE STATION 41
|
|
May 31, 2020
|
Open Until Contracted
|
20-09 HARMON PARK TENNIS COURTS
|
|
May 17, 2020
10:00 AM
|
Jul 6, 2020
|
20-06 2020 CITY HALL IMPROVEMENTS
|
|
May 3, 2020
|
Jun 18, 2020
|
20-08 N BROADWAY REGIONAL DETENTION BASIN
|
|
Mar 15, 2020
|
May 6, 2020
|
20-1840 RFQ PURCHASE AND REDEVELOPMENT OF CITY-OWNED PROPERTY NORTH MECHANIC STREET
|
|
Mar 15, 2020
|
Feb 4, 2021
|
20-05 BYPASS 48-KINGSVIEW DRIVE TRAFFIC SIGNAL REPLACEMENT
|
|
Mar 8, 2020
1:00 AM
|
May 6, 2020
1:00 AM
|
20-03 DOWNTOWN PEDESTRIAN SAFETY IMPROVEMENTS
|
|
Mar 1, 2020
10:00 AM
|
Apr 28, 2020
10:00 AM
|
20-01 2020 CONCRETE AND PAVING PROGRAM
|
|
Feb 16, 2020
1:00 AM
|
May 6, 2020
1:00 AM
|
20-1839 COMPREHENSIVE PLAN
|
|
Feb 9, 2020
1:00 AM
|
Jul 17, 2020
1:00 AM
|
19-1838 GLOSSER RD PUMP STATION EQ BASIN 20" FORCE MAIN STUDY
|
|
Nov 19, 2019
|
Apr 28, 2020
|
19-1837 RFQ ACQUISITION AND ADAPTIVE REUSE/REDEVELOPMENT EXISTING FIRE STATION 41 AT 20 W. SILVER
|
|
Oct 13, 2019
10:00 AM
|
Open Until Contracted
|
19-10 NORTH BROADWAY CORRIDOR IMPROVEMENTS
|
|
Oct 6, 2019
10:00 AM
|
Dec 5, 2019
1:00 AM
|
19-11 BERRY PARK CONSTRUCTION
|
|
Oct 6, 2019
10:00 AM
|
Dec 5, 2019
1:00 AM
|
19-07 WWTP UV DISINFECTION SYSTEM REPLACEMENT
|
|
Sep 8, 2019
1:00 AM
|
Oct 29, 2019
1:00 AM
|
19-03 MONROE ROAD IMPROVEMENTS
|
|
Jul 7, 2019
1:00 AM
|
Sep 5, 2019
1:00 AM
|
19-02 DAVE AVENUE RECONSTRUCTION
|
|
Jun 30, 2019
1:00 AM
|
Aug 31, 2019
1:00 AM
|
19-09 PLEASANT PARK BASKETBALL COURTS
|
|
Jun 30, 2019
1:00 AM
|
Sep 5, 2019
1:00 AM
|
RFQ 19-1836 ELECTRIC DEPT STORAGE BLDG DESIGN BUILD
|
|
Jun 30, 2019
1:00 AM
|
Feb 11, 2020
1:00 AM
|
19-08 2019 CITY HALL IMPROVEMENTS
|
|
Jun 9, 2019
1:00 AM
|
Jul 31, 2019
1:00 AM
|
19-1834 FIRE STATION 41 FACILITY DESIGN
|
|
Jun 2, 2019
1:00 AM
|
Open Until Contracted
|
20-07 GLOSSER ROAD PUMP STATION LARGE PUMP REPLACEMENT
|
|
Apr 19, 2019
|
Jul 6, 2020
|
19-1833 MULBERRY PLAZA ARCHWAY FEATURE
|
|
Apr 14, 2019
1:00 AM
|
Jun 17, 2019
1:00 AM
|
19-1832 Redevelopment North Mechanic Street
|
|
Mar 17, 2019
10:00 AM
|
Dec 5, 2019
1:00 AM
|
19-01 2019 CONCRETE AND PAVING PROGRAM
|
|
Feb 10, 2019
1:00 AM
|
Apr 3, 2019
1:00 AM
|
19-04 CENTER FAIRVIEW AND WALNUT RECONSTRUCTION
|
|
Feb 10, 2019
1:00 AM
|
Apr 3, 2019
1:00 AM
|
RFQ 18-1829 HEALTH INSURANCE BROKERAGE AND CONSULTANT SERVICES
|
|
Dec 9, 2018
1:00 AM
|
Mar 7, 2010
1:00 AM
|
18-18 COUNTRYSIDE YMCA BIKE PATH-DEERFIELD RD TRAIL REALIGNMENT
|
|
Oct 28, 2018
1:00 AM
|
Dec 19, 2018
1:00 AM
|
MOWING AND BUSH-HOGGING RIGHT-OF-WAYS AND VARIOUS CITY OWNED PARCELS
|
|
Oct 21, 2018
1:00 AM
|
Mar 22, 2019
1:00 AM
|
18-17 MOWING AND BUSH-HOGGING RIGHT-OF-WAYS AND VARIOUS CITY OWNED PARCELS
|
|
Oct 21, 2018
1:00 AM
|
Mar 22, 2019
1:00 AM
|
18-08 SIGNAL IMPROVEMENTS NORTH BROADWAY AND MONROE RD
|
|
Oct 14, 2018
1:00 AM
|
Dec 4, 2018
1:00 AM
|
18-13 FORD F550 CAB AND CHASSIS OUTFITTING
|
|
Oct 14, 2018
1:00 AM
|
Nov 28, 2018
1:00 AM
|
18-07 MULBERRY ST PEDESTRIAN PLAZA
|
|
Oct 7, 2018
1:00 AM
|
Dec 4, 2018
1:00 AM
|
18-10 MILLER PARK PARKING LOT EXPANSION
|
|
Oct 7, 2018
1:00 AM
|
Nov 30, 2018
1:00 AM
|
RFQ 18-1828 ELECTRIC DEPT STORAGE BLDG DESIGN-BUILD
|
|
Sep 30, 2018
1:00 AM
|
Open Until Contracted
|
RFQ 18-1826 2019-2021 CIVIL ENGINEERING DESIGN SERVICES
|
RFQ 18-1826 2019-2021 CIVIL ENGINEERING DESIGN SERVICES
|
Aug 26, 2018
1:00 AM
|
Apr 1, 2019
1:00 AM
|
18-05 S SYCAMORE PUBLIC PARKING LOT IMPROVEMENTS
|
|
Aug 12, 2018
1:00 AM
|
Oct 3, 2018
1:00 AM
|
18-11 ELECTRIC ADMIN PUBLIC PARKING LOT IMPROVEMENTS
|
|
Jul 29, 2018
1:00 AM
|
Sep 27, 2018
1:00 AM
|
18-06 SOUTH BROADWAY RECONSTRUCTION
|
|
Jun 10, 2018
1:00 AM
|
Aug 1, 2018
1:00 AM
|
RFQ 18-1825 LEBANON BRANDING AND MARKETING INITIATIVE
|
|
May 27, 2018
1:00 AM
|
Oct 4, 2018
1:00 AM
|
18-03 POLICE STATION LOCKER ROOM RENOVATIONS
|
|
May 20, 2018
1:00 AM
|
Aug 1, 2018
1:00 AM
|
18-04 HILLVIEW AVE WATER MAIN REPLACEMENT
|
|
May 20, 2018
1:00 AM
|
Jul 12, 2018
1:00 AM
|
18-14 ELECTRIC DEPT BLANKET MATERIAL BID
|
|
May 20, 2018
1:00 AM
|
Oct 3, 2018
1:00 AM
|
18-16 ELECTRIC LINE CLEARANCE
|
|
May 20, 2018
1:00 AM
|
Oct 23, 2018
1:00 AM
|
18-12 WASTEWATER TREATMENT PLANT AERATION/CLARIFIER TANK NO. 4 CONCRETE REHAB & SLUDGE STORAGE AREA
|
|
Apr 15, 2018
1:00 AM
|
Jun 7, 2018
1:00 AM
|
18-1824 PROPERTY AND CASUALTY INSURANCE BROKER SERVICES
|
|
Apr 1, 2018
1:00 AM
|
Dec 6, 2018
1:00 AM
|
RFP 18-1823 COUNTRYSIDE YMCA TRAIL REALIGNMENT AND EXTENSION
|
|
Feb 25, 2018
1:00 AM
|
May 10, 2018
1:00 AM
|
RFP 18-1827 EAST MULBERRY ST GATEWAY FEATURE
|
|
Feb 25, 2018
1:00 AM
|
May 10, 2018
1:00 AM
|
RFQ 18-1822 PURCHASE AND REDEVELOPMENT OF SOUTH CHERRY ST AT
|
|
Feb 18, 2018
1:00 AM
|
Open Until Contracted
|
RFQ 18-1820 PURCHASE AND REDEVELOPMENT OF CITY OWNED PROPERTY 511 NORTH BROADWAY
|
|
Feb 11, 2018
1:00 AM
|
Oct 1, 2018
1:00 AM
|
RFQ 18-1821 PURCHASE AND REDEVELOPMENT OF CITY OWNED PROPERTY PLEASANT SQUARE
|
|
Feb 11, 2018
1:00 AM
|
Oct 1, 2018
1:00 AM
|
18-02 CONCRETE AND PAVING PROGRAM
|
|
Feb 4, 2018
1:00 AM
|
Apr 24, 2018
1:00 AM
|
RFP 18-1817 FIRE FACILITY STUDY PROJECT
|
|
Feb 4, 2018
1:00 AM
|
Apr 3, 2018
1:00 AM
|
RFP 18-1817 FIRE FACILITY STUDY PROJECT
|
|
Feb 4, 2018
1:00 AM
|
Apr 3, 2018
1:00 AM
|
RFP 18-1819 PHONE SYSTEM PROJECT
|
|
Feb 4, 2018
1:00 AM
|
Dec 31, 2018
1:00 AM
|
18-02 18-03 2018 CONCRETE AND PAVING PROGRAM
|
|
Jan 28, 2018
1:00 AM
|
Feb 3, 2018
1:00 AM
|
RFP 17-1816 PROF SERVICES-DEVELOP AREA PLAN FOR WEST MAIN ST (SR63) CORRIDOR
|
|
Oct 1, 2017
1:00 AM
|
Jan 15, 2018
1:00 AM
|
RFQ 15-1800 2015 ROADWAY DESIGN SERVICES
|
|
Feb 8, 2015
1:00 AM
|
Open Until Contracted
|
RFQ 14-1799 GARFIELD PARK BOOSTER STATION DESIGN
|
|
Nov 9, 2014
1:00 AM
|
Open Until Contracted
|
RFQ 13-1792 CONSTRUCTION LEBANON MUNICIPAL SERVICE FACILITY
|
|
Apr 6, 2014
1:00 AM
|
Open Until Contracted
|
RFQ 13-1792 LEBANON MUNICIPAL SERVICE FACILITY DESIGN-BUILD PROJECT
|
|
Sep 7, 2013
1:00 AM
|
Open Until Contracted
|
RFQ 18-1818 TURTLECREEK CHANNEL RESTORATION
|
|
Jan 21, 2008
1:00 AM
|
May 15, 2018
1:00 AM
|